Well here are the pics... today the did the lower gutters and roof tiles (well most of them, the back has a big gap where it appears they have run out of tiles).... outside is getting there!
Friday, July 24, 2009
Tuesday, July 21, 2009
Bits and pieces
Lately a few bits and pieces have been happening around the house. I'm sure as I write this I will forget something! They have hammered in the spoke things from between the bricks into the frame. Some re-enforcing has happened on the walls where TVs may go. Also some carpentry around some of the pipping.
The air con ducting has gone through the house. They had some trouble running it to the downstairs theatre at the front of the house so have had to change the wall on the upstairs lounge to have a nieche bordering it. Will upload pics soon so you can understand.
We have made a change to the inside as well. After standing the house we thought that the downstairs toilet door would be better if moved into the hallway that leads to the laundry, so they are moving that for us.
The cleaned the bricks on the upper level.
The eves have been done under the upstairs gutters and they were painted the other day.
M had to meet up with site supervisor yesterday for a walk through of the frame. He explained what happened with the ducting tubes and came up with a solution for us. He said that the renderring will be done this week to the portico and hopefully the roofing on the lower level that isn't yet complete then they can get on to the cladding. Said possibly few weeks after the electrician will come through then should be ready for sheeting...
The air con ducting has gone through the house. They had some trouble running it to the downstairs theatre at the front of the house so have had to change the wall on the upstairs lounge to have a nieche bordering it. Will upload pics soon so you can understand.
We have made a change to the inside as well. After standing the house we thought that the downstairs toilet door would be better if moved into the hallway that leads to the laundry, so they are moving that for us.
The cleaned the bricks on the upper level.
The eves have been done under the upstairs gutters and they were painted the other day.
M had to meet up with site supervisor yesterday for a walk through of the frame. He explained what happened with the ducting tubes and came up with a solution for us. He said that the renderring will be done this week to the portico and hopefully the roofing on the lower level that isn't yet complete then they can get on to the cladding. Said possibly few weeks after the electrician will come through then should be ready for sheeting...
Saturday, July 11, 2009
Solar installed
Monday, July 6, 2009
Saturday, July 4, 2009
Roof tiles delivered
On Friday arvo swung by the see that the roof tiles had been delivered!! Did a walk through today to find that more plumbing had been completed inside
Thursday, July 2, 2009
Gutters
Subscribe to: